Patented MTE Technology

Flange Integrity
Reimagined.
Shutdowns
Accelerated.

BridgeFlow™ MTE simultaneously tightens all flange bolts in a single stroke eliminating sequential star-pattern bolting, operator variability, and flange leaks caused by improper installation.

ASME B16.5 CompatibleNo Flange ModificationPatented Technology
90%
Faster than traditional bolting
Up to 100× in some applications
<5%
Preload variation
Uniform flange load every time
~105%
First-event ROI
Payback in under one shutdown cycle
26%
Of flange leaks from improper install
BridgeFlow eliminates the root cause
How It Works

Four steps. One stroke. Zero compromise.

BridgeFlow™ MTE replaces the entire multi-pass sequential bolting process with a single synchronized operation — engineered around flange behavior, not just bolt tightening.

01

Position the System

Place BridgeFlow™ MTE around the flange. No flange modification required — fully compatible with ASME B16.5.

02

Encircle & Align

The system encircles the pipe and driving heads automatically align to each bolt position.

03

One Stroke Operation

A single input simultaneously engages all bolts. Resistance-based equilibrium automatically routes torque to the loosest bolt first.

04

Verified Integrity

Dynamic torque redistribution achieves equilibrium across all bolts. Digital version records final torque per head for QC documentation.

Why BridgeFlow™

Hydratight perfected controlled bolting. BridgeFlow reimagines it.

Traditional hydraulic systems improve torque delivery. BridgeFlow transforms load equalization — embedding flange integrity into the system itself.

Simultaneous Multi-Bolt Tightening

All bolts tighten at once — not sequentially. Eliminates the star pattern entirely and the human error that comes with it.

Traditional Method

3–5 sequential passes · Star pattern required · Operator-dependent · Re-torquing needed

BridgeFlow™ MTE

1 stroke · No star pattern · Automatic equilibrium · Verified preload

Automatic Torque Redistribution

Mechanical resistance-based equilibrium — torque flows to the loosest bolt automatically until all bolts reach the same preload.

Engineered Preload Equalization

Achieves <5% preload variation — not operator-dependent. Uniform gasket compression prevents leaks at the source.

Shutdown Acceleration

8 minutes per flange vs. 45 minutes traditionally. 40 flanges completed in 5.3 hours instead of 30 hours.

Reduced Operator Dependency

The system embeds integrity into its mechanics — not into technician skill. Works consistently regardless of crew experience.

Digital Integrity Documentation

Optional wireless real-time torque monitoring per driving head, final torque recording, and digital QC audit trail.

ROI Framework

One hour of avoided downtime often pays for the entire system.

At $20,000/hour downtime cost, 40 flanges, and a 4-person crew — BridgeFlow™ MTE saves $511,000 per shutdown event against a $40,000 unit investment.

Calculate Your Savings

Hours Saved

24.7h

Per shutdown event

Downtime Recovery

$494K

Production value recovered

Labor Savings

$17.3K

Per event

First-Event ROI

~105%

Payback < 1 shutdown

Get Started

Ready to eliminate sequential bolting from your shutdown process?

Talk to our team about your specific flange scope, downtime costs, and how BridgeFlow™ MTE fits your next planned outage.